Friday, 22 April 2011

MODULAR FORM

Looking at my previous blog entry. My first conceptual attempt at a design is verging on the organic, 'fluid-like' elements of architecture. An issue that Ryan brought up during my feedback in week 8 is "how do you make this modular?" Architecture that moves rather than static.

Developing design in 3 parts

1. FRAMING SYSTEM (steel) - fixed to site

2. MODULES (slot in/slot out) - prefab module shipped to site - slot into steel frame system


3. MESH FACADE (attached/detached) - attach to steel frame system


No comments:

Post a Comment